Basket Empty
EXHEAT® has secured a half a million pound contract to supply a 3.7MW SRR Electric process heating skid, to include a 3.3KV transformer, Heater, control system, and all interconnecting pipe-work.
The skid unit is to be installed at Abu Dhabi refinery of Takreer, at Sas Al Nakhl in Abu Dhabi.